Ut tellus dolor, dapibus eget, elementum ifend cursus eleifend, elit. Aenea ifen dn tor wisi Aliquam er at volutpat. Dui ac tui end cursus eleifendrpis.
Phone No:
(+91 9397999999)
Banjara Hills, Hyderabad Telangana,India.
Email Address:
[email protected]
If you have a question for us, see if we’ve answered it below. You’ll find answers
to the questions people ask us about the most.
A 3kW solar system typically costs between ₹1.5 lakh to ₹2.2 lakh (after subsidies). With Go2Solar’s Zero Upfront Cost Plan, you can install it today and pay via easy EMIs (starting at ₹4,500/month). Your EMI will match your current electricity bill, making the switch effortless!
We handle the hassle for you! Go2Solar India:
✅ Submits subsidy paperwork to your state’s DISCOM.
✅ Guides you through eligibility criteria (e.g., system size, meter type).
✅ Tracks approvals until the subsidy is credited to your loan/bank account.
Note:Â Subsidy amounts vary by state (e.g., 30% in some regions).
From site assessment to activation, it takes 4-6 weeks:
Day 1-3: Technical survey & system design.
Week 2: Subsidy approval & net metering application.
Week 3-4: Installation & commissioning.
Week 5-6: DISCOM inspection & grid connection.
Your system comes with:
✅ 25-year panel warranty (performance guarantee).
✅ 10-year inverter warranty.
✅ Free annual maintenance for 5 years.
For urgent issues, call our 24/7 helpline ([number]); we resolve most problems within 48 hours!